We start the week over in Birmingham with a πππ π πππππ project!
Why was this project difficult?
The project had been excavated previously to a depth of 2 meters in some places – but that was not the πππππππ
The issue was that the location of this 2 meter depth was filled back in with ππππππππ π€¦ββοΈ
Along with various ππππππ ππππππ & an ππππππππππ πππ the homeowner of this project had been left with a hole in there back garden for π ππππππ!
How did we solve this?
- We conducted a site visit, mapped the concrete which had been poured and came up with a ππππππππ alongside our engineer which allowed us to move the pile locations out of the area of the concrete
- During our site visit we left the homeowner and appointed builder with a πππππ understanding of what is required in order for the site to be prepared for piling
- Once we was informed the site was prepared πππππππππ we revisited the site to check everything πππππ to the mobilisation of our piling rigs.
- We organised a concrete pump so that the ππππππ ππππππ for the concrete were no more! π
At Rhino Piling we pride ourselves on πππππ service and with this project being in Birmingham and with us being in Manchester it is too easy for it to be overlooked, but with the infrastructure we have build we make sure ππ ππππππ the location of the project you will still get the same πππππ πππππππ!
On this rear extension in Birmingham Rhino Piling installed the following
Installed 6 piles π
Installed 12 meters of ground beam π§
Inspection by building control π·ββοΈ
Installed over 6 M3 of concrete π
Rhino Piling – We get you out of the ground! π¦
π·Β Piling – Birmingham
π»Β https://bit.ly/3hUYP2p
π§Β enquiries@rhinopiling.co.uk
β0161 706 0365